I 90 over SEP SHEEP CAMP RD

3.7M W WHITEHALL · County 043, Montana · Built 1966 · 2 Lanes · 4,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

45.893247, -112.179106

This bridge is in worse condition than 19.9% of bridges in County 043. The average bridge in Montana is 0 years old; this one is 60 years old.

Nearby Bridges

Bridge Details

Structure #
I00090245+01442
Year Built
1966
Length
33.2 m (108.9 ft)
Max Span
12.6 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
4,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.