I 90 over CLARK FORK RIVER

5M W DRUMMOND · County 039, Montana · Built 1970 · 4 Lanes · 13,081 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I00090148+04361
Year Built
1970
Length
77.6 m (254.6 ft)
Max Span
26.5 m
Width
23.8 m (78.1 ft)
Lanes
4
Daily Traffic
13,081
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.