I 90 over CLARK FORK RIVER

10.5M E SUPERIOR · County 061, Montana · Built 1967 · 2 Lanes · 3,825 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
I00090058+05502
Year Built
1967
Reconstructed
2012
Length
251.7 m (825.8 ft)
Max Span
59.4 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
3,825
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,568,000
Total Project Cost
$2,352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.