I 90 over CEDAR CREEK

1.2M E SUPERIOR · County 061, Montana · Built 1960 · 2 Lanes · 3,825 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I00090049+00662
Year Built
1960
Reconstructed
2012
Length
51.5 m (169 ft)
Max Span
17.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
3,825
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$319,000
Total Project Cost
$479,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.