I 15 over INT MANCHESTER

4M S VAUGHN · County 013, Montana · Built 1960 · 2 Lanes · 5,227 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
I00015286+05752
Year Built
1960
Length
33.5 m (109.9 ft)
Max Span
11.1 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
5,227
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.