I 15 over RR

2M N CRAIG · County 049, Montana · Built 1967 · 2 Lanes · 2,201 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
I00015235+09782
Year Built
1967
Length
111.5 m (365.8 ft)
Max Span
24.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,201
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$696,000
Total Project Cost
$1,044,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.