I 15 over SEP LUMP GULCH ROAD

0.6M N CLANCY · County 043, Montana · Built 1969 · 2 Lanes · 3,787 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
I00015182+07381
Year Built
1969
Length
24.4 m (80.1 ft)
Max Span
9.3 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
3,787
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.