I 15 over TUCKER CREEK ROAD

3.1M N DIVIDE · County 093, Montana · Built 1976 · 2 Lanes · 2,283 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
I00015105+08792
Year Built
1976
Length
23.2 m (76.1 ft)
Max Span
22.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
2,283
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.