I 15 FRONTAGE RD over BEAVERHEAD R-INT RAMP
8M N CLARK CANYON DAM · County 001, Montana · Built 1988 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
45.097917, -112.777375
This bridge is in worse condition than 24.2% of bridges in County 001. The average bridge in Montana is 0 years old; this one is 38 years old.
Nearby Bridges
I 15 over SEP HIGH BRIDGE RD
Built 1988
I 15 over SEP HIGH BRDGE RD
Built 1988
I 15 over INT GRASSHOPPER CREEK
Built 1988
I 15 over BEAVERHEAD RIVER
Built 1981
I 15 over BEAVERHEAD RIVER
Built 1965
I 15 over INT GRASSHOPPER CREEK
Built 1988
I 15 over BEAVERHEAD RIVER
Built 1965
I 15 over BEAVERHEAD RIVER
Built 1980
COUNTY ROAD 278 over BEAVERHEAD RIVER 124
Built 1988
RYAN CANYON RD over BEAVERHEAD RIVER 023
Built 1908
Bridge Details
- Structure #
- I00015052+06323
- Year Built
- 1988
- Length
- 31.7 m (104 ft)
- Max Span
- 15.5 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $169,000
- Total Project Cost
- $254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.