DAVID THOMPSON BRG over KOOTENAI RIVER D/S DAM
LIBBY DAM MONTANA · County 053, Montana · Built 1967 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.406667, -115.316664
This bridge is in worse condition than 37.7% of bridges in County 053. The average bridge in Montana is 0 years old; this one is 59 years old.
Bridge Details
- Structure #
- CEPNWSMT1SGLI01
- Year Built
- 1967
- Reconstructed
- 1982
- Length
- 149 m (488.8 ft)
- Max Span
- 29.5 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $1,405,000
- Total Project Cost
- $2,108,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.