DAVID THOMPSON BRG over KOOTENAI RIVER D/S DAM

LIBBY DAM MONTANA · County 053, Montana · Built 1967 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

48.406667, -115.316664

This bridge is in worse condition than 37.7% of bridges in County 053. The average bridge in Montana is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
CEPNWSMT1SGLI01
Year Built
1967
Reconstructed
1982
Length
149 m (488.8 ft)
Max Span
29.5 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$1,405,000
Total Project Cost
$2,108,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.