NFSR over SMITH CREEK

CONDON · County 063, Montana · Built 2010 · 1 Lanes · 40 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011001000012242
Year Built
2010
Length
16.8 m (55.1 ft)
Max Span
15.8 m
Width
5.9 m (19.4 ft)
Lanes
1
Daily Traffic
40
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.