ROAD 201 over NICHOLS COULEE
SECT 10 T21N R27E · County 071, Montana · Built 1963 · 1 Lanes · 15 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
47.591183, -108.232444
This bridge is in worse condition than 49.5% of bridges in County 071. The average bridge in Montana is 0 years old; this one is 63 years old.
Bridge Details
- Structure #
- 000061520-00042
- Year Built
- 1963
- Length
- 9.4 m (30.8 ft)
- Max Span
- 4.6 m
- Width
- 3.7 m (12.1 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $183,000
- Total Project Cost
- $270,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.