S 248 over Drainage
5m east of Richland · County 019, Montana · Built 2023 · 2 Lanes · 194 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
48.809506, -105.946611
This bridge is in worse condition than 18.2% of bridges in County 019. The average bridge in Montana is 0 years old; this one is 3 years old.
Nearby Bridges
Bridge Details
- Structure #
- 000000202406482
- Year Built
- 2023
- Length
- 20.6 m (67.6 ft)
- Max Span
- 19.8 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 194
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.