COUNTY RD 001 over COTTONWOOD CREEK
16M S JOPLIN · County 051, Montana · Built 2020 · 2 Lanes · 100 vehicles/day
Overall
Culvert
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 9 | Excellent |
Location
48.326567, -110.856719
This bridge is in worse condition than 40% of bridges in County 051. The average bridge in Montana is 0 years old; this one is 6 years old.
Bridge Details
- Structure #
- 000000202003449
- Year Built
- 2020
- Length
- 8.5 m (27.9 ft)
- Max Span
- 3.9 m
- Width
- 45.7 m (149.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.