IRR BIA RTE 127 over MILL POCKET-CAMAS CANAL
6.3KM NW OF NIARADA · County 089, Montana · Built 2004 · 1 Lanes · 10 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.8031, -114.666922
This bridge is in worse condition than 37.5% of bridges in County 089. The average bridge in Montana is 0 years old; this one is 22 years old.
Bridge Details
- Structure #
- 00000000000P844
- Year Built
- 2004
- Length
- 11.3 m (37.1 ft)
- Max Span
- 11 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.