IRR BIA RTE 4 over WHITETAIL CREEK

11.3 KM NE OF HEART BUTTE · County 035, Montana · Built 1972 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000000C109
Year Built
1972
Length
14.4 m (47.2 ft)
Max Span
13.7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.