BOULDER RD over BOULDER RIVER 003

12M S MCLEOD · County 097, Montana · Built 2017 · 2 Lanes · 157 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000004519
Year Built
2017
Length
38.4 m (126 ft)
Max Span
36.5 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
157
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$82,000
Total Project Cost
$90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.