COUNTY ROAD 134 over USBR MAIN CANAL 070
1M SW FAIRVIEW · County 083, Montana · Built 2016 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.845528, -104.060528
This bridge is in worse condition than 10.3% of bridges in County 083. The average bridge in Montana is 0 years old; this one is 10 years old.
Nearby Bridges
7TH ST over USBR MAIN CANAL 093
Built 2019
4TH ST over USBR MAIN CANAL 073
Built 2008
S 201-1ST ST W over USRS CANAL
Built 1934
COUNTY ROAD 132 over USBR MAIN CANAL 064
Built 1985
COUNTY HIWAY over BNSF RAILROAD
Built 2016
S 200 over SECOND HAY CREEK
Built 1986
COUNTY ROAD 211 over SECOND HAY CREEK 065
Built 2018
COUNTY ROAD 131 over USBR MAIN CANAL 080
Built 1998
S 200 over FIRST HAY CREEK
Built 1986
COUNTY ROAD 131 over USBR MAIN CANAL 072
Built 2000
Bridge Details
- Structure #
- 000000000004218
- Year Built
- 2016
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.3 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $50,000
- Total Project Cost
- $75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.