E PARROT CREEK RD over MUSSELSHELL RIVER 012
7M NE ROUNDUP · County 065, Montana · Built 2016 · 2 Lanes · 81 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.4714, -108.392531
This bridge is in worse condition than 17.9% of bridges in County 065. The average bridge in Montana is 0 years old; this one is 10 years old.
Bridge Details
- Structure #
- 000000000003797
- Year Built
- 2016
- Length
- 53.3 m (174.9 ft)
- Max Span
- 19.8 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 81
- Material
- Prestressed Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $685,000
- Total Project Cost
- $1,771,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.