E. GATE ROAD over BIG PINEY RIVER
FLW 10 S. OF TOLEDO LN · County 169, Missouri · Built 1941 · 2 Lanes · 1,105 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.759897, -92.058381
This bridge is in worse condition than 28.8% of bridges in County 169. The average bridge in Missouri is 0 years old; this one is 85 years old.
Nearby Bridges
FLW 25 over TRIB TO BIG PINEY RIVER
Built 2015
LAKE PERIMETER RD over LAKE OUTFALL 018
Built 1960
GOLF CRSE RD FLW26 over BIG PINEY RIVER
Built 1957
RT J S over SPRING CR
Built 1955
1ST STREET over DRY CREEK
Built 1960
MICHIGAN ST. over DRY CRK DRAINAGE
Built 1960
REPLACEMENT AVE over DRY CRK DRAINAGE
Built 1960
MINNESOTA/NEBRASKA over DRY CREEK DRAINAGE
Built 1960
COUNTY RD 6410 over TEASLEY HOLLOW
Built 1900
TEXAS RD over UNKNOWN BR
Built 1996
Bridge Details
- Structure #
- DAPTRAWOO0VB001
- Year Built
- 1941
- Reconstructed
- 2023
- Length
- 131.2 m (430.4 ft)
- Max Span
- 28.5 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,105
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.