E. GATE ROAD over BIG PINEY RIVER

FLW 10 S. OF TOLEDO LN · County 169, Missouri · Built 1941 · 2 Lanes · 1,105 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPTRAWOO0VB001
Year Built
1941
Reconstructed
2023
Length
131.2 m (430.4 ft)
Max Span
28.5 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
1,105
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.