RT D E over BR OF SPRING RVR

S 17 T 29 N R 32 W · County 097, Missouri · Built 1952 · 2 Lanes · 671 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
9992
Year Built
1952
Length
10.1 m (33.1 ft)
Max Span
5.1 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
671
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$325,000
Total Project Cost
$487,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.