RT Y E over DRAIN DTCH #35

S 22 T 27 N R 12 E · County 207, Missouri · Built 1949 · 1 Lanes · 1,950 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
9827
Year Built
1949
Length
19.8 m (65 ft)
Max Span
7.6 m
Width
6.8 m (22.3 ft)
Lanes
1
Daily Traffic
1,950
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$570,000
Total Project Cost
$854,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.