RT B S over N COBB CR

S 2 T 33 N R 15 W · County 105, Missouri · Built 1947 · 2 Lanes · 1,099 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
9790
Year Built
1947
Length
14.1 m (46.3 ft)
Max Span
2.4 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
1,099
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.