MO 7 S over TURKEY CR

S 1 T 39 N R 22 W · County 015, Missouri · Built 1939 · 2 Lanes · 2,566 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
9603
Year Built
1939
Length
8.8 m (28.9 ft)
Max Span
3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,566
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.