RP IS35N TO IS70W over IS 35 BLUFF ST CST E
S 31 T 49 N R 34 W · County 095, Missouri · Built 1967 · 1 Lanes · 3,578 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.105344, -94.593344
This bridge is in worse condition than 95.4% of bridges in County 095. The average bridge in Missouri is 0 years old; this one is 59 years old.
Nearby Bridges
IS 35 S over OPEN WALLS EACH SI
Built 1970
RP IS70E TO IS35S over BLUFF ST CST EIGHTH S
Built 1967
UNION (ST LOUIS) over KCT RAILWAY
Built 2003
IS 70 E over CST BEARDSLEY RD
Built 1953
IS 70 W over CST MULBERRY ST MADIS
Built 1960
IS 35 N over US 169
Built 2023
IS 35 S over IS 70 US 169 CST W 6
Built 2021
RP US169S TO IS35S over CST W 5TH ST IS 70 U
Built 2022
RP IS35N TO US169N over CST W 5TH ST IS 35 U
Built 2022
BROADWAY BLVD S over IS 35
Built 1954
Bridge Details
- Structure #
- 922
- Year Built
- 1967
- Length
- 570 m (1870.1 ft)
- Max Span
- 49.5 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 1
- Daily Traffic
- 3,578
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,755,000
- Total Project Cost
- $11,633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.