RT A E over DRAIN DTCH NO 73

S 26 T 19 N R 10 E · County 155, Missouri · Built 1935 · 2 Lanes · 289 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
9189
Year Built
1935
Length
14.6 m (47.9 ft)
Max Span
13.7 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
289
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$359,000
Total Project Cost
$538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.