RP BROADWAY TO IS3 over IS 670 RP IS35N TO IS
S 5 T 49 N R 33 W · County 095, Missouri · Built 1967 · 3 Lanes · 6,687 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
39.096194, -94.590825
This bridge is in worse condition than 79.9% of bridges in County 095. The average bridge in Missouri is 0 years old; this one is 59 years old.
Nearby Bridges
RP IS35N TO IS670W over IS 670
Built 1967
RP IS35S TO IS670E over IS 670
Built 1967
IS 35 N over IS 670 RP IS35N TO IS67
Built 1967
IS 35 S over IS 670 RP IS35N TO IS67
Built 1967
RP IS35N TO 14TH S over RP IS670W TO IS35N
Built 1967
RP BROADWAY TO IS3 over RP IS670W TO IS35N
Built 1967
W 14TH ST E over IS 35 RP IS35S TO IS670
Built 1965
BROADWAY BLVD S over IS 670 RP IS670E TO CEN
Built 2011
SUMMIT ST S over IS 670 RP IS670E TO IS3
Built 1980
RP PENNSYLVANIA AV over IS 35 RP IS670W TO IS35
Built 1967
Bridge Details
- Structure #
- 908
- Year Built
- 1967
- Reconstructed
- 1992
- Length
- 110.3 m (361.9 ft)
- Max Span
- 26.8 m
- Width
- 14.1 m (46.3 ft)
- Lanes
- 3
- Daily Traffic
- 6,687
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,095,000
- Total Project Cost
- $3,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.