RT H E over DRAINAGE DITCH

S 962 T 37 N R 10 E · County 157, Missouri · Built 1933 · 2 Lanes · 1,541 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
8958
Year Built
1933
Length
8.4 m (27.6 ft)
Max Span
2.4 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
1,541
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.