IS 55 N over CST GASCONADE ST

S 3 T 44 N R 7 E · County 510, Missouri · Built 1965 · 4 Lanes · 42,845 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
879
Year Built
1965
Reconstructed
1985
Length
59.1 m (193.9 ft)
Max Span
21.3 m
Width
17.3 m (56.8 ft)
Lanes
4
Daily Traffic
42,845
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,517,000
Total Project Cost
$2,275,000