MO 42 E over BR

S 35 T 40 N R 11 W · County 125, Missouri · Built 1932 · 2 Lanes · 438 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
8741
Year Built
1932
Length
6.8 m (22.3 ft)
Max Span
3 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
438
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.