MO 149 S over WHITE OAK CR

S 7 T 58 N R 16 W · County 121, Missouri · Built 1932 · 1 Lanes · 281 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
8663
Year Built
1932
Length
21 m (68.9 ft)
Max Span
11 m
Width
6.4 m (21 ft)
Lanes
1
Daily Traffic
281
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$494,000
Total Project Cost
$741,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.