RT A S over JAMES RVR

S 2 T 29 N R 18 W · County 225, Missouri · Built 1931 · 2 Lanes · 2,616 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
8616
Year Built
1931
Length
39 m (128 ft)
Max Span
13 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
2,616
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,005,000
Total Project Cost
$1,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.