RT A S over TURNBO CR

S 15 T 30 N R 18 W · County 225, Missouri · Built 1931 · 2 Lanes · 5,558 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
8615
Year Built
1931
Length
6.8 m (22.3 ft)
Max Span
3.7 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
5,558
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.