RT H E over BRUSHY CR

S 10 T 49 N R 20 W · County 195, Missouri · Built 1930 · 2 Lanes · 608 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
8578
Year Built
1930
Length
10.4 m (34.1 ft)
Max Span
3 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
608
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.