RT W E over NEW CHNL CHARITON

S 22 T 65 N R 16 W · County 197, Missouri · Built 1961 · 2 Lanes · 264 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
8263
Year Built
1961
Length
80.2 m (263.1 ft)
Max Span
30.5 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
264
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,534,000
Total Project Cost
$2,301,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.