RT AP S over MOSS HOLLOW

S 9 T 25 N R 10 W · County 091, Missouri · Built 1962 · 2 Lanes · 164 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
8258
Year Built
1962
Length
14.1 m (46.3 ft)
Max Span
4 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
164
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.