RT HH S over STILCAMP DRAIN DTC

S 10 T 22 N R 6 E · County 023, Missouri · Built 1954 · 1 Lanes · 133 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
7585
Year Built
1954
Length
20.4 m (66.9 ft)
Max Span
8.2 m
Width
6.8 m (22.3 ft)
Lanes
1
Daily Traffic
133
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$325,000
Total Project Cost
$488,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.