RT B E over ROCHE PERCHE CR

S 19 T 52 N R 13 W · County 175, Missouri · Built 1952 · 2 Lanes · 973 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
7579
Year Built
1952
Length
24.4 m (80.1 ft)
Max Span
8.2 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
973
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$626,000
Total Project Cost
$939,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.