IS 70 E over IS 270

S 15 T 46 N R 5 E · County 189, Missouri · Built 1957 · 6 Lanes · 140,710 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
754
Year Built
1957
Reconstructed
1978
Length
78 m (255.9 ft)
Max Span
23.5 m
Width
35.6 m (116.8 ft)
Lanes
6
Daily Traffic
140,710
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,105,000
Total Project Cost
$4,657,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.