RT ZZ S over MAIN DRAIN DTCH

S 19 T 25 N R 10 E · County 207, Missouri · Built 1961 · 2 Lanes · 594 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
7339
Year Built
1961
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
594
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$760,000
Total Project Cost
$1,140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.