RT WW E over BIG BUFFALO CR

S 23 T 41 N R 20 W · County 015, Missouri · Built 1958 · 2 Lanes · 128 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Culvert
4
Poor

Bridge Details

Structure #
7121
Year Built
1958
Length
7.7 m (25.3 ft)
Max Span
2.6 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
128
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.