RT AB E over DRAIN DTCH #24

S 15 T 26 N R 12 E · County 207, Missouri · Built 1957 · 1 Lanes · 541 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
6967
Year Built
1957
Length
64.3 m (211 ft)
Max Span
15.7 m
Width
6.8 m (22.3 ft)
Lanes
1
Daily Traffic
541
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,427,000
Total Project Cost
$2,140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.