RT N S over HARRIS CR

S 13 T 22 N R 3 E · County 181, Missouri · Built 1958 · 1 Lanes · 199 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

36.551758, -90.710014

This bridge is in worse condition than 72.6% of bridges in County 181. The average bridge in Missouri is 0 years old; this one is 68 years old.

Nearby Bridges

Bridge Details

Structure #
6725
Year Built
1958
Length
39 m (128 ft)
Max Span
16 m
Width
7.2 m (23.6 ft)
Lanes
1
Daily Traffic
199
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$816,000
Total Project Cost
$1,224,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.