E 9TH ST W over IS 70

S 5 T 49 N R 33 W · County 095, Missouri · Built 1958 · 3 Lanes · 1,430 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
6609
Year Built
1958
Length
80.5 m (264.1 ft)
Max Span
25 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
1,430
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,484,000
Total Project Cost
$2,226,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.