US 60 W over MAIN DTCH DIST #5

S 7 T 25 N R 12 E · County 207, Missouri · Built 1960 · 2 Lanes · 4,643 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
6596
Year Built
1960
Length
25.9 m (85 ft)
Max Span
8.8 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
4,643
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$477,000
Total Project Cost
$715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.