US 67 N over IS 70 RP NATURAL BRID

S 12 T 46 N R 5 E · County 189, Missouri · Built 1957 · 3 Lanes · 17,465 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
6575
Year Built
1957
Length
75.6 m (248 ft)
Max Span
22.6 m
Width
12.6 m (41.3 ft)
Lanes
3
Daily Traffic
17,465
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,515,000
Total Project Cost
$2,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.