IS 29 S over CST NE PARVIN RD

S 1 T 50 N R 33 W · County 047, Missouri · Built 1954 · 3 Lanes · 52,438 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
6412
Year Built
1954
Length
37.5 m (123 ft)
Max Span
18.9 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
52,438
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.