RT H S over PEDLAR CR

S 20 T 61 N R 36 W · County 003, Missouri · Built 1954 · 2 Lanes · 384 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
6395
Year Built
1954
Reconstructed
2009
Length
33.2 m (108.9 ft)
Max Span
13.7 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
384
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.