MO 79 S over BATTLE CR

S 2 T 55 N R 3 W · County 163, Missouri · Built 1954 · 2 Lanes · 452 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
6369
Year Built
1954
Length
7 m (23 ft)
Max Span
3.4 m
Width
18.7 m (61.4 ft)
Lanes
2
Daily Traffic
452
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.