RT W S over SPRING BR

S 19 T 43 N R 4 E · County 099, Missouri · Built 1952 · 2 Lanes · 6,992 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
6262
Year Built
1952
Length
11.8 m (38.7 ft)
Max Span
3.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
6,992
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$204,000
Total Project Cost
$306,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.